WP2 Kick-off Telco November 8th 2012 (13:00-15:00 CET)
Discussion / decisions for T2.1-T2.3:
- Each task proceeds its work independently but there are common deadlines with regard to major deliverables’ releases and continuous technical reviews / feedback by the consortium during their preparation. Milestones:
- Finalize ToC and assignments of D2.1-D2.3: 15/11/2012
- 1st draft of D2.1-D2.3: 10/12/2012
- Discussion of D2.1-D2.3: Main conclusions, issues during the Athens project meeting on 13/12/2012
- Final draft of D2.1-D2.3 for internal final technical review and check: 21/1/2013
- Final check from technical reviewers: 25/1/2013 – reviewers to be assigned
- Final D2.1-D2.3 to be submitted to the EC: 30/1/2013
- T2.1 / D2.1 was presented by NTUA. The initial version of D2.1 Cloud-based Services Analysis Report together with deadlines / assignments are available at: https://docs.google.com/document/d/1DoZADcY5ytzbddEk5WvDmnpvyP2PViAlfzWxPLYjpFY/edit
- Next steps: Initial categorization & list of services (by NTUA): 12/11/2012; Feedback & Updates on list (by ALL): 16/11/2012
- T2.2 / D2.2 was presented by TSSG. You may find attached the proposed table of contents.
- Next steps: Provide more details on ToC and assignments: 15/11/2012
- T2.3 / D2.3 was not discussed since LOGICA, leader of the task, was not present in the call. The ToC should be circulated asap and finalized by 15/11/2012.
- Emphasis to be put on providing summary tables and figures that provide in a visual way the evaluation of approaches / technologies / etc. found in the state-of-the art rather than mere text analyzing in depth each approach.
- Study results from FP7 1.2 projects. Incorporate 1st feedback / collaboration opportunities that emerged from the Collaboration Meeting in October (@Eric and Claudia: please share with us your first impressions which are the relevant projects)
- T2.1-T2.3 with regard to standardization. It is too early for D2.1-D2.3 to produce results that will be mature enough to be presented in a standardization committee.
- Adopt a common template (i.e. including introduction, methodological approach, conclusions)
- Access to preliminary results to be ensured for the whole consortium, not only for the task participants.
+Key issues along D2.1-D2.3:+ - Concise text to be published as white paper with key take-aways for the Design and Implementation
- Method of collaborative work within the consortium: Wiki? Documents?
- Ensure results’ validation beyond the consortium
- Through online discussions in LinkedIn
- Through engagement of the Advisory Groups (What, Who, How, When) ?
+Discussion / decisions for T2.4-T2.5:+
- T2.4-T2.5 will start earlier than the DoW and will be aligned with an agile approach:
- T2.4 to include a short Vision analysis, 10-15 high level stories, a small number of high level non-functional considerations and user both for the platform and the apps
- T2.5 to include Back log of coarse-grained/detailed stories, early complexity estimations and definition of done criteria.
- An initial approach to T2.4 was presented by AMBIE in the attached slides. An initial approach to T2.5 was discussed by FOKUS.
- Proposed timeplan:
- Initial approach for a step-by-step methodology and templates to describe Use cases, Requirements by AMBIE and FOKUS: 30/11/2011
- Thoughts and proposals for the basic use case, story: 10/12/2012
- Brainstorming on Use cases, Requirements / user stories in the Athens project meeting: 13/12/2011
- Finalize ToC and assignments for D2.4 / D2.5: 13/12/2012
- 1st draft of D2.4: 18/1/2013
- 1st draft of D2.5: 31/1/2013
Next WP2 Telco: Please post your availability at http://www.doodle.com/f4c2wnduv77rywq4 by Thursday 15/11 eob.
_Participants:
Eric, Leigh & Donal (TSSG), Teti, George, Sotiris, Iosif & Michalis (NTUA), Robert & Lukasz (FOKUS), Hans, Olfa & Ayse (AMBIE), Theodore (VELTI), Peter (BETAPOND)
_