16 results.
D5.1 Draft specification of the common elements of the management framework: The D5.1 has a focus on Network Management (NM) which refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance, and provisioning of networ...
D5.2 Specification of the common elements of the management: This deliverable is an update on the progress of the PRISTINE Distributed Management System (DMS). It is broken down into several sections which provide more detail on the strands that need to be w...
D2.2 PRISTINE reference framework: D2.2 reports on a review of the RINA specifications that are relevant to the technological areas addressed in PRISTINE (congestion control, routing, resource allocation, authentication, access cont...
D5.4 Consolidated Management System ready!: This document describes the results and major contributions to the Network Management System for RINA networks that the PRISTINE project has been researching and developing. RIB design, NMS System ...
D3.2 Initial specification and proof of concept implementation of techniques to enhance performance and resource utilization in networks: In this document, “an initial specification and a proof of concept implementation” of the techniques proposed in the previous document, “draft specification”, are presented. The goal is to show how...
D5.3 Proof of concept DIF Management System: This deliverable describes the proof of concept of DIF Management System for the first iteration of PRISTINE DIF Management System (DMS). Specifically, it contains the design of the DMS manager and...
D2.6 Advanced RINA Simulator ready!: Simulation is widely accepted validation and verification tool to test and prove new technologies. Simulation runs can reveal design flaws, performance drawbacks and other weak points. Simulation r...
D4.2 Innovative security and reliability enablers: The security objective is set to reduce the security risks as much as possible by defining security functions and enablers. This document, D4.2, builds upon the security functions, mechanisms, and ...
D3.1 Draft specification of techniques to enhance performance and resource utilization in networks: Preceding the initial specification and proof of concept implementation of techniques to enhance performance and resource utilization in networks that is due in month 16, this document outlines a “...
D2.4 RINA Simulator: Simulation often serves for validating and verifying new technologies, which do not have yet implementation. Simulation also finds weak-points and drawbacks during test runs and subsequently allows...